The City of Tallassee will be accepting sealed bids for the repairs at the Tallassee Community Library. Sealed bids will be accepted at City Hall until Tuesday, March 10, 2020 @ 3:00pm. Bids will be opened at 5:00pm, Tuesday, March 10, 2020 during the Work Session.

 

Scope of work for the Tallassee Community Library is as follows:

 

  • Prep exterior of Library including but limited to brick, concreate porch and stoops, columns, steps, wheel chair ramp, rails, windows, doors, by means of pressure washer, sandblaster, and/or manual sander/scraper.
  • Remove any loose or unnecessary caulking.
  • Reglaze windows where needed.
  • Remove all debris from rear exit door and basement window area.
  • Install Smooth Fiberglass 3/0 x 6/8 right hand outswing door unit with appropriate PVC jamb PVC brick mold and stainless steel hinges.
  • Remove all pre-existing shutters.
  • Install 15 pair of 1×6 Rough Sawn Cedar Board and Batten shutters at least 23”x9’.
  • Seal shutters with a high quality semi-transparent finish equivalent to Benjamin Moore Arborcoat stain/sealer.
  • Remove shingles, existing flashing and any other rotten decking around chimney on right side of Library.
  • Install new decking, ice/water shield membrane, flashing and shingles around/against chimney.
  • If it is found that water is penetrating brick chimney, prep and seal brick chimney.
  • Remove all Crown sub-fascia.
  • Remove all rotten fascia and soffit and replace with new 1x lumber.
  • Install and wrap sub-fascia with G2 PVC trim coil, suing trim nails and color match caulk.
  • Remove and replace any rotten wood on windows and below window panels.
  • Install 6” gutter around perimeter of building to include upper section roof with appropriate downspouts and Leaf guard.
  • Construct and install access door to crawlspace on right side of building using ½” Versatex PVC material or equivalent with exterior hinges and hasp.
  • Cover existing basement windows with ½” Versatex PVC material or equivalent also using galvanized flashing and NPI or equivalent caulk to seal.
  • Install both vented and non-vented vinyl soffit.
  • Using a high quality exterior paint and primer equivalent to Benjamin Moore Gloss finish, paint windows, panels below windows, doors, columns, porch, stoops, and rails.
  • Inside Library, 1st room on right, cut out and remove upper section where mold is present, and approximately 6’ on all sides.
  • Treat studs with mold mixture.
  • Install ceiling insulation if needed.
  • Install moisture rock sheetrock to areas previous cut out, mud, and finish.
  • Install new radius and trim like new status.
  • Remove and clean (2) AC vents.
  • Paint sheetrock and trim with high quality interior paint equivalent to Benjamin Moore paint and primer.
  • Install dehumidifier to AC unit for mold prevention.